Details: earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. 1: 3: 6 or richer mix. providing, laying, spreading and compacting crushed graded stone aggregate as per table 400-10 & 400.11 to wet mix macadam specifications including premixing the material with water to omc in mechanical mixer (pug mill) as per design mix, carriage of mixed material by tipper to site laying in uniform layers, with motor grader/f.e. loader/paver finisher, in sub-base/base course on a well
Sector: Urban Authority