Details: earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per mort&h specification clause 301 in all type of soil providing and laying lean cement concrete 1:4:8 in sub- base over a prepared sub-grade with coarse and fine aggregate conforming to is: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 mpa at 7 days, mixed in concrete mixer, laid manually,compacted with surface , finishing and curing complete as per clause 601, 112 of mort&h specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. providing
Sector: RDPR