Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc. depth upto 1.5 m providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - all work upto plinthlevel code) 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 m
Sector: RDPR