Details: construction work of garbage collection center pamdi for foundation, trench and drain etc. digging up to 1.5 m depth of soil, tamping the bottom, pouring water, dressing the sides, removing the excavated soil, filling the empty spaces with soil again after filling the foundation and disposing of the remaining soil up to a distance of 50 m. in cement concrete foundation or floor, 40 mm nominal measurement
Sector: RDPR