Details: ditch fencing: size-1.50m. at top ,0.90m. at base and 1.20m. high(rates are for volume including voids) .laying of dug up soil on inner side of the plantation and removing boulders from it. mechanically excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect hard soil mixed with kankar / boulders, morrum1300rmt x 1.44 = 1872 excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect soft/loose soil 500 rmt x 1.44 = layout of 3000 rmt. contour trenches digging of contour trenches of size 0.45mx0.45m,(rates are for volume including voids) laying of dug up soil on lower ,removing boulders from it.(mechanicially) hard soil mixed with kankar / boulders, morru
Sector: Forest and Environment