Details: earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305).in ordinary soil mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper carriage of materials-earth, sand, gravel, kankar, lime, flash, morrum, manure or sludge. for 500 meter construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 _____do___________ with lead 500mtr to 1000 mtr providing, laying, spreading and compacting crushed graded stone aggregate of as per table 400-10 and 400-11 to wet mix macadam specification including premixing the material with water to omc in mechnical mixer as per approved design mix, carriage of mixed
Sector: Urban Authority