Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea,juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge.cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b) thick cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department (b) over 15 cms to 30 cms. girth excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect, lead up to 250 m (c) hard soil mixed with kankar / boulders, morrum earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dre
Sector: Water Resource Department