Details: dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by engineer. bituminous courses earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.50 m earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in ordinary roc
Sector: Urban Authority