Details: construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per mort&h specification clause 305. (lead taken upto 5 km) dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. providing, laying, spreading and compacting of granular sub-base by providing close graded material (table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per mort&h specification clause - 401 including all material, labour, machinery,lighting, guarding and maintenance of diversion. grading - iii material
Sector: RDPR