Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level.in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc depth upto 1.5 m demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-incharge in cement mortar providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level :1:4:8 (1 cement : 4fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). brick work with fps bricks of class designation 75 in superstructure above pli
Sector: RDPR