Details: earthwork in excavation for roadway in soil, including stacking / disposal of surplus material exclusive of compensation of earth (morth specification : clause 301 to 305). by mannual means providing, laying and spreading of granular sub- base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per morth specification : clause no. 401. grading-iii providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading a
Sector: Urban Authority