Details: steel foot bridge l: 50.0m(appx.) x b: 2.25m x h: 2.9m the structural foot bridge scantlings are to be chipped, scrapped & cleaned including removal of old paint & internal scantling prior to crop & renew under instruction & satisfaction of engineer-in-charge. gauging including preparation of report of the under repair foothbridge/pathway,chqd. plates & internal scantlings prior to crop & renew as per ship repairing practice under instruction & satisfaction of engineer-in-charge. the report to be submitted to the engineer-in-charge. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing of as directed within a lead of 75 m.in ground floor including roof(b) above 150 mm. thick grouting the foundation bolt (by hilti method ) for vertical post, base plate as per the direction & instruction to the satisfaction of engineer-in-charge. dismantling & removal of existing utility service oil line, electricity lines etc. stacking of dismantle
Sector: Infrastructure