The West Bengal Public Works Department has published a tender for "WBPWD/EE/DJ/eNIT 08/Sl No.1/2025-2026" on the 22 Nov 2025. This tender belongs to Road Repair category. This tender is published in Darjiling, West Bengal location. The vendors interested in this tender and related Road Repair tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Road Construction Tenders | CC Road Tenders | Bus Bay Tenders |
Around 52926 tenders were floated in West Bengal in the past month with major spending on cc road Tenders, drain construction Tenders, tube well Tenders
| Tender Title | WBPWD/EE/DJ/eNIT 08/Sl No.1/2025-2026 |
|---|---|
| Tender Description | excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge . in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth. (iv) without pumping out water and shoring plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excludingshuttering if any. 1:3:6 proportion providing and laying design mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper |
| Comments | excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge . in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth. (iv) without pumping out water and shoring plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excludingshuttering if any. 1:3:6 proportion providing and laying design mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper |
| Published Date | |
|---|---|
| Due Date | 16 Dec 2025 00:00:00 |
| Estimated Value | 43.65 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |