The ZP West Bengal has published a tender for "WB/18/BDO/MAL/2025-26/05" on the 25 Sep 2025. This tender belongs to Underground Drain Construction category. This tender is published in Jalpaiguri, West Bengal location. The vendors interested in this tender and related Underground Drain Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road and drain Tenders | drainage Tenders | drain Tenders
Related categories: Dam Infrastructure Tenders | Canal construction service Tenders | Main Canal Construction Tenders |
In Jalpaiguri district, West Bengal, a total of 1 Underground Drain Construction tenders have been published, with 1 tenders released last quarter.
Tender Title | WB/18/BDO/MAL/2025-26/05 |
---|---|
Tender Description | excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, andbackfilling with approved material complete as per direction of the engineer-in-charge .in all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.a) upto 3 m depth(iii) without pumping out water but includingshoring as required earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by department within a lead of 150 m. providing & laying design mix concrete for plain/ reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of |
Comments | excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, andbackfilling with approved material complete as per direction of the engineer-in-charge .in all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.a) upto 3 m depth(iii) without pumping out water but includingshoring as required earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by department within a lead of 150 m. providing & laying design mix concrete for plain/ reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of |
Published Date | |
---|---|
Due Date | 06 Oct 2025 00:00:00 |
Estimated Value | 1.99 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |