Details: dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specifications clause 202 for rural roads of mord. (ii) by mechanical means bituminous courses box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flanks as necessary or on berm to approximate grade & camber and rolling the sub grade with power roller to proper camber and grade as per direction and satisfaction of engineer - in charge including uprooting and removing plants and jungles when and where necessary. depth above 150 mm but upto 300 mm depth above 150 mm removal of unserviceable soil with disposal upto 1000 metres removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per technical specification clause 302.3.11 for rural roads of mo
Sector: Urban Authority