Details: earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding, laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1.5 m labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant is codes. hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with requ
Sector: District Administration