Details: clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (specific permission of engineer-in-charge prior to execution will be necessary). (payment to be made on area cleared) cleaning , sludge, weeds , liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the engineerin- charge.
Sector: Industry Development