Details: 1) visiting site, collecting all required data, information etc., conducting land survey, soil investigation etc and preparation of drawing, structural design and estimate/dpr, structural details and working drawing along with quantity assurance plan for one year, vetting of estimates as required by various order of govt. of west bengal. 2) project cost rs. 4.40 crore for one year consultancy fee value is 2.25% of estimated value = rs. 9.90 lacks.
Sector: Forest and Environment