Details: providing fhtc from the existing ci/di/upvc/hdpe/gi/ac distribution pipeline by installing 10 mm nb gun-metal ferrule conforming to i5 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15mm nb pvc (schedule 80)/20mm od hdpe (pe100, pn16)/20mm od ppr-c (class-sdr7.4/pn16) pipes upto required length with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the engineer-in-charge and upto a point just inside the premises of the household or as directed by eic. supply and installation of a 15mm dia. alloy iron bib (tested to 21 kg/cm2) above 1.0 mtr. from ground, an alloy stop of 15 mm dia. with brass spindle (tested to 21 kg/cm2) to be fitted in a position as directed
Sector: Water supply and Sewerage