Details: earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile includingsupply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the engineer-in-charge within a lead of, nb :- measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. no extra payment will be made for stacking b) beyond 1.00 km and upto 2.00 km supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (dia. to be measured at mid length). driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) where boats are not necessary.(a) ordin
Sector: Irrigation