Details: laying and jointing pvc pipe. heading earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work) single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. (ii) cement concrete with 30 mm down graded shingles excluding shuttering. n.b. varietyin ground floor(a) 1:3:6 proportion ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
Sector: Zilla Parishad