Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre works and post works).(i) in ordinary soil. supplying, spreading and compacting yellow sand to required thickness, in layers not exceeding 150 mm layer by water and packing and ramming layer by to proper gradient and camber, inundating each lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramminf where necessary etc all as specified and as directed by the eic. brick pavement with 1st class / picked jhama bricks (as per direction of engineer in charge) with joints set closed in cement mortar 1:6 including preparation of bed by cutting or filling with ramming the filled up earth to the same profile as that of the finished pavement. rate is inclusive of cost of supply of all materials, labour and all incidental
Sector: Urban Authority