Details: earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone) including removing, spreading and stacking of soils within a lead of 75m.as directed. the item includes trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water etc. as required, complete.depth of excavation not exceeding 1500 mm. single brick flat soling of picked jhama bricks including ramming and dressing the bed to proper level and filling joints with powderes earth or local sand. cement concrete with 30mm down graded shingles excluding shuttering (1:3:6) in foundation : ordinary cement concrete ( mix 1:1.5:3) with graded stone chips (20mm down excluding shuttering and reinforcement,if any in ground floor. as per relevent i.s. codes.b). river bazree. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer c
Sector: Zilla Parishad