Details: earth work in excavation of foundation trenches ordrains, semi liquid mud or slusy earth (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (payment to be made on the basis ofmeasurement of finished quantity of work) (a) with earth obtained from excavation of foundation. filling in foundation or plinth by silver sand inlayers not exceedi
Sector: Municipality