Details: construction of approach road for disposal of sludge generated in sewage treatment plants of bhatpara municipal area in the new dumping ground located at mouza – madrail near 10 mld, wsp stp of the bhatpara sewerage project work and bmya playground. supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks anddepressions by ramming wherever necessary. clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specifications clause 201 for rural roads of mord.by manual means box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate gr
Sector: Urban Authority