Details: item description/ heading gb1 conveyor belt supply at work site sal wood windingengine drum lagging, size (4"x4"x36"). supply at work site m20x150mm, ht bolt, 10.9 grade,half thread. supply at work site m20 ht nut, 10.9 grade, half thread dismantling of old and damaged drum lagging from the drum and transporting the same to unit store. (sk-rs.1122- 2heads, ssk-rs.1082- 2heads, usk- rs.1042-6heads) =rs.10,660/shift dismantling of 32mm winding rope on either end of drum and transporting the same to unit store by using gas cutting (sk-rs.1122- 2heads, ssk-rs.1082- 2heads, usk- rs.1042- 6heads)= rs.10,660/shift. cleaning of complete 4 nos. of circumference wooden lagging racer for fitting of new lagging (ssk-rs.1082-1 heads, usk- rs.1042- 5heads)= rs.10,660/shift. sizing of new wooden lagging as per drum periphery,drilling holes on either end and fitting the same on drum (sk-rs.1122- 2heads, ssk-rs.1082- 2heads, usk-rs.1042- 6heads)= rs.10,660/shift total impact of gst for the purpose of c
Sector: Mining