Details: labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling edging including removing debris (b) double flat soling earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. (b) depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. (c) depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. hire and labour charges for shoring work (including necessary close plank wallin
Sector: Urban Authority