Details: borrow pit earth for road flenge. pwd(r) 237/3.01 borrow pit earth 89.90/ cost 25/ total 114.90/ earthwork in excavation in foundation structure upto 3m depth as per drawing & technical specification clause 1104 for rural road of mord including setting out, construction shoring and bracing, removal of stumps and other deleterious matters, dressing of sides and bottom and backfilling with approved materials. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work)(c) (i) with carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place metho
Sector: Zilla Parishad