Details: earthwork in excavation of foundation trenches or drains in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m as directed. the item includes necessary trimming the sides of trenches, ievelling, dressing and ramming the bottom, bailing out water as required complete. depth of excavation not exceeding 1500mm. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work). filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. (payment to be made om measurement of finished quantity). laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and
Sector: District Administration