Description: Construction of Community Hall at Lama Gaon in Pokhrebong GP Name of Work Construction of Community Hall at Lama Gaon in Pokhrebong GP
Details: Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation. Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground flo
Sector: District Administration