Description: CARRYING OUT VARIOUS INSTRUMENTATION WORKS AS PER STANDARD SPECIFICATION BY PROVIDING ALL REQUIRED MATERIALS IN CONNECTION WITH COMPOSITE WORK FOR UTILITIES AND OFFSITES PART B FOR PANIPAT REFINERY EXPANSION PROJECT P25 AT PANIPAT REFINERY HARYANA Name of Work CARRYING OUT VARIOUS INSTRUMENTATION WORKS AS PER STANDARD SPECIFICATION BY PROVIDING ALL REQUIRED MATERIALS IN CONNECTION WITH COMPOSITE WORK FOR UTILITIES OFFSITES PART B FOR PANIPAT REFINERY EXPANSION PROJECT P25 AT PANIPAT REFINERY HARYANA
Details: INSTRUMENTATION PRESSURE GAUGES AND ACCESSORIES (Excl. supply of Impulse pipe/Tubing materials) Installation of Line mounted or Remote mounted or Local Gauge Board mounted Pressure gauge/ Pressure gauge with Pulsation Dampener/Syphon/ Over-range Protector (direct/ surface mounted/ diaphragm seal type) inclusive of mounting of instrument, supply and of supports/tray, mounting on support (if support required), laying of capillary on tray, fabrication and installation of manifolds/ impulse lines with supports as per standards indicated below, hydraulic testing and painting of supports but exclusive of Supply of Instrument, Gauge Board, Yoke, Piping material and Calibration. In Carbon Steel as per Standard 7-52-0433/1113 In Carbon Steel as per Standard 7-52-1210 In Carbon Steel as per Standard 7-52-0432/1112 Stainless Steel as per standard 7-52-1112 VORTEX FLOWMETERS Installation of integral/remote transmitters/ Preamplifier for Vortex flowmeter on yoke/ instrument including laying an
Sector: Infrastructure