Details: item no:-1::page no-276,item no-12.01/i/a:-earthwork in excavation for foundation of structures as per drawing and technical specification including setting out, removing, spreading or stacking of spoils within a lead of 150m as directed and including triming the sides of the trenches, leveling, dressing and ramming the bottom, complete as per direction of engineer - in - charge in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.iii) without pumping out water but including shorting as required. item no:-2::laying 150 mm size boulder soling including rough dressing breaking necessary hand packing and ramming down small stone pieces in the intestices including rolling and preparation the bed to proper level and camber with necessary cushioning over bed and ultimate filling of voids with sand including cost of materials but excluding the cost of stone boulder. item no:-3::cement concrete (1:2:4) with graded stone chips (20 mm nominal size) excluding shutteri
Sector: Zilla Parishad