Details: labour for picking up existing metalled road surface to a specified av. depth , inccluding screening and stacking pavement materials. for av depth above 75 mm but not exceeding 150 mm by manual means.by manual means [stone metal surface] removal of unserviceable soil with disposal upto 1000 metres removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per technical specification clause 302.3.11 for rural roads of mord. (mode of measurement: pre works and post works) supplying, spreading and consolidating stone dust to depth of 100 mm and above at desired density & c.b.r. as per specification with power roller to proper gradient and camber, including watering as necessary & lighting, guarding, barricading and making adequate wearthen bundth where necessary to protect the edges & curing with water for 2 to 3 days mending cracks and depressions by rolling where necess
Sector: Urban Authority