Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over theflank as necessary or on berm to approximate grade& camber and rolling the sub-grade with power rollerto proper camber and grade as per direction andsatisfaction of engineer-in-charge including uprootingand removing plants and jungles when and wherenecessary.(a) depth up to 150 mm. dry rubble flooringconstruction of dry rubble flooring at cross drainageworks for relatively less important works.boulder 150mm to 225mm @ 1.00 m3/m3 (with stacking)bazree 11.20 mm @0.20 m3/m3 (with stacking) hire and labour charges for shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. the rate is inclusive of fitting, fixing and striking out after completion of work as per
Sector: PWD