Details: construction of branch road on north side of new culvert earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including taking out and disposal of excavated earth within or outside site to unobjectionable place and lift upto 1.5m, as directed by engineer-in-charge. disposed earth to be levelled and neatly dressed. extra for levelling & neatly dressing of disposed soil completely to be paid separately as per item no. mplcn00600 all kinds of soil carriage charge for disposal of earth by mechanical means, including loading, transporting, stacking, unloading to approved municipal dumping ground / unobjectionable place as per direction of engineer- in-charge beyond iocl premises for all leads and including all lifts. distance > 3 km< 5 km supply and stacking of fly ash conforming to irc- 58 at site, including carriage, loading, unloading & stacking within premises filling with avail
Sector: Custom1