Details: mooring pin-1 nos earthwork in excavation all complete as per specification & direction of eic providing & laying cement concrete in foundation trenches in m15 (1:2:4) all complete as per specification & direction of eic supplying, fitting & fixing isa 75 x 75 x 6 ms angle (i.e in diagonal) in bottom of the foundation welded with ismb 300 all complete as per specification & direction of eic supply, fabrication & of ismb 300 of 2.5 m length & driving it 6m below the bed level of river all complete as per specification and direction of eic. supply, & welding of 2 nos of 20mm dia & 600mm length of tmt bar horizontally on the top of ismb 300 all complete as per specification and direction of eic. terminal maintenance supply and placement of sand filled bags all complete as per specification & direction of eic replacement of fenders with old automobile truck tyres including fixing tying etc. complete procurement of gi pipe for side support of pontoon about 5 to 7 mtrs long all complete
Sector: Harbor