Details: earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) depth of excavation not exceeding 1,500 mm. earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (payment to be made on the basis ofmeasurement of finished quantity of work)a) with earth obtained from excavation of foundation. labour for laying 150 mm to 200 mm boulder soling including roughdressing hand packing and ramming down small pieces in the intersticsincluding rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. cement concrete with 30 mm down graded shingles ex
Sector: Urban Authority