Details: picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.kv 14= 2nos (4, 6) kv 12 = 3nos (5,6,8) kv 11= 3nos (4,6,7) kv 10= 3nos (5,6,7) kv7=2nos (2&4) kv 6=4nos (2,3,4,9) m.s. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to is: 226, is: 808 & sp (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to is: 816- 1969 & is: 1995 using electrodes of approved make and brand conforming to is:814- 2004, haulage, hoisting and all complete. the rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all i
Sector: Infrastructure