Details: earth work in cxcavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding lateritc or sandstone) inc!uding removing, spereading or stacking the spoils within n lend of 75m. as directed. the item includes neccessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.[pwd(wb)2017/building schedule/p-1/lt. no.2(a)](a)depth of cxcavation /not exceeding i,500mm.1x2.5mx2.5mx 1.5m depth=9.375 m³ (ii)earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.(a) with earth obtained from excavation foundation.[pwd(wb)2017/building schedule/p-1/lt. no.3(a)(c)(i)](a) 1/5 th of excavation. 9.38/5=1.88 m³@77.54 per m³ single brick flat soling of picked jhama bricks including ramming and dressing bed to proper llevel and filling joints with local sand. [pwd(wb)2017/building schedule/p-24/lt. no.4(3rd corrigenda p-1lt.no-1)]1 x 2.50 x 2.50=6.25 m²@322.0
Sector: District Administration