Description: Comprehensive Annual Maintenance Contract for AVR/SCVS
Details: SCVS/AVR Panel Doors Operations2 SCVS/AVR Panel Panel Enclosure34 SCVS/AVR Panel Body EarthingInsulation of Power Cable5 SCVS/AVR Panel Out put Neutral Groudning6 Operation of Cooling Fans7 Power Termination checks8 Checks of Variac/Dimmer movements910Hard Opening/closing to of Panel DoorsPanel Door Locks operation to be checkeda) Check for Dustb) Cheks for Rusting-To be report to EICTight/Loose/Missing of panel earthingCheck Insulation of Power cable for any heat/cracksEnsure Out put Neutral Grounding provided in seprate earth pits to avoidcirculation of un-balance current in systemWorking/Jam/NoiseAvaibility of Safety Grill of Cooling FanCondition of Termination to be checked ona) Power Transformersb)MCCB, Control cardsc) Power contactorsd) Variacfor Loose connection, Failue of Lugs, Carbon deposition etc. Repair/Replace Panel Door HingesReplace the Faulty Panel Locka) To be clean with blower for Panel & FIltersb) Extra Holes to be sealed with double side washer or Puf-SealEnsure Pro
Sector: Custom1