The DG,BSF,MHA has published a tender for "Providing, Installation, testing and commissioning of 25 KWp off Grid Solar Power Plants at BOPs RKB 19R Sunil Mangoor Maru Rann Wav Limboni Ambaji Dharnidhar Bashir Suigam and Goal Hill of 123 Bn Now 137 BN of SHQ BSF Gandhinagar" on the 14 Nov 2025. This tender belongs to Off Grid Solar Plant category. This tender is published in Gandhinagar, Gujarat location. The vendors interested in this tender and related Off Grid Solar Plant tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: off grid solar power plant Tenders | solar power plants Tenders | solar Tenders
Related categories: Hydro power plant Tenders | Gas power plants Tenders | Solar power plants Tenders |
DG BSF MHA issued 255 tenders for Off Grid Solar Plant last year
With, 6 floated just last month.
| Tender Title | Providing, Installation, testing and commissioning of 25 KWp off Grid Solar Power Plants at BOPs RKB 19R Sunil Mangoor Maru Rann Wav Limboni Ambaji Dharnidhar Bashir Suigam and Goal Hill of 123 Bn Now 137 BN of SHQ BSF Gandhinagar |
|---|---|
| Tender Description | planning, designing, providing, installation, testing and commissioning of hybrid/off-grid ( with the provision to charge from main power source) solar photovoltaic power plant conforming to mnre specifications as amended, consisting of mono crystalline silicon solar cells, necessary protections, earthing, mounted on rcc structure of suitable strength with following components complete as required as per appdx “a” the rates quoted should be inclusive of all taxes, transportation charges , loading/unloading at site etc as reqd:- (a) solar photovoltaic module of capacity 350 wp or above, manufactured in india, conforming to is 14286/iec 61215, iec 61730-part-1, iec 61730-part-2. solar photovoltaic module conversion efficiency shall not be less than 16.5%. pv modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) power conditioning unit (pcu) of 350-8 |
| Comments | planning, designing, providing, installation, testing and commissioning of hybrid/off-grid ( with the provision to charge from main power source) solar photovoltaic power plant conforming to mnre specifications as amended, consisting of mono crystalline silicon solar cells, necessary protections, earthing, mounted on rcc structure of suitable strength with following components complete as required as per appdx “a” the rates quoted should be inclusive of all taxes, transportation charges , loading/unloading at site etc as reqd:- (a) solar photovoltaic module of capacity 350 wp or above, manufactured in india, conforming to is 14286/iec 61215, iec 61730-part-1, iec 61730-part-2. solar photovoltaic module conversion efficiency shall not be less than 16.5%. pv modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) power conditioning unit (pcu) of 350-8 |
| Published Date | |
|---|---|
| Due Date | 03 Dec 2025 00:00:00 |
| Estimated Value | 4.29 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |