Details: name of work porbandar :- ctr of line no.09 earthwork in filling in embankment, guide bunds,around buried type abutments, bridge gaps,trolley refuges, platforms etc. with contractor'sown earth conforming to soil quality classsq1/sq2/sq3, after preparation of foundationsas applicable, benching in existing bankswherever required, spreading in layers withmotor grader, bringing the moisture content toomc, mechanical compaction to specifieddensity and dressing of bank to final profile asper rdso specifications: rdso/2020/ge: irs0004 with latest correction slips. note: 1)foundation preparation, benching includingadditional earthwork on account of this,wherever required, shall be paid extra underrelevant schedule item for benching. 2) paymentfor earthwork under this item shall be madebased on the cross section measurementscalculated (i) with original ground profile ofexisting bank based on initial ground levelsbefore doing benching and (ii) final profile of thebank worked out with final lev
Sector: Railways