Details: supply, complete creation & maintenance of 35000 plantation with installation of fencing around the plantation at jounapur & aya nagar installation of fencing around the plantation for protection of plantation:-structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (using isa 50x50 having 5 mm thickness) structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(using msf 15 mm wide and 4 mm thickness) dash hold fastener 12.5 mm dia, 50 mm long with 6 mm dia bolt providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 40 mm nom
Sector: Forest and Environment