Details: taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge. laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of engineer-in-charge. (length of finished kerb edging shall be measured for payment). (old kerb stones shall be supplied by the department free of cost) providing and laying at or near ground level factory made kerb stone of m-25 grade cement concrete in position to the required line, level and curvature, join
Sector: Urban Authority