Details: shifting of debris after demolishing/ dismantling the material to the point of garbageoutside the campus. providing & fixing of 80mm ms in the drain pipe, work includes the cutting, jointing, sealing the both ends properly etc., work should be complete in all respect as per directions of engg-in-charge providing & fixing of 100 mm ms in the drain pipe, work includes the cutting, jointing, sealing the both ends properly etc., work should be complete in all respect as per directions of engg-in-charge. providing and fixing of 10 hp non clog sewage pump, 3 phase, head approx. 40 mtr, min. 75 mm solid handling, flow range – approx. 4000 lpm with necessary fixing arrangement complete. (make: - mody/ wilo / grundfos). lifting of existing pump with dismantling of existing pipes & fittings with necessary cutting & making complete. providing and fixing of star / delta starter panel for 10 hp sewage pump ( made up by ms powder coated sheet 14 swg , consisting of (make of items to used: lt/abb
Sector: University