Details: maintenance of existing all gym equipment in particular location (typically 14 nos gym equipment) various parks of west zone(hort division-3 and hort. division-8) including all minor and major repairing of the damaged serviceable/ unserviceable part of gym equipments complete as per directions of engineer in charge.condition:-1) inspection of the equipments shall be made at weekly intervals and report shall be submitted to engineer-in-charge.once in a month2) regular maintenance for one year of all the gym equipments(typicaly 14 nos) each at all locations including all repairs in dda parks all over delhi and shall include the following:a) inspection and adjustment of drive, timing and running belt, wherever required.b) check and set right/replacement of worn out bearings, misaligned moving points, adjust/tighten loose parts, covers, seats, foundation, flooring, regular olling and greasing etc..c) tightening of nuts/bolts/screws i/c welding of various parts/joints of equipment.d) costme
Sector: Urban Authority