Details: demolishing cement concrete manually / by mechanical means including disposal of material within 50 meters lead as per direction of engineer –in – charge (a) 1:4:8 or leaner mix demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar providing and laying factory made precast concrete solid block of 200 mm thickness of grade m-10 made of c&d waste from approved manufacturer in foundation & plinth in: (a)cement mortar 1:6 (1 cement : 6 coarse sand) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. brick work with co
Sector: Industry Development