Details: maintain water supply- to maintain water supply from sec 19 rohini ht bps (ht installation) as per prevalent schedule and or change time to time on daily basis as per direction of engineer- in –charge by operating all electrical and mechanical equipment, by deploying following personal (skilled / un-skilled), detail of staff to be deployed is as under:- 1. skilled staff in shift – 3 nos. (1 no. in each shift)2. unskilled staff in shifts – 6 nos. (2 nos. in each shift)
Sector: Water supply and Sewerage