Details: gst % for the tender please select the rate of gst in cell ay13. rate selected shall be applicable for the entire boq. civil arc mjpl nrpl mathura part-a (composite ) concrete work : providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:1.5:3 [1 cement : 1.5 coarse sand (zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources] centering and shuttering including strutting, propping etc. and removal of formwork for : foundations, footings, bases for columns dismantling & demolishing : demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per the directions of engineer-in-charge. [notes: (1) dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) providing of necessary covers/ barricades around the work area shall be done prior to
Sector: Custom1