Description: Supply and installation of boom barriers 3 nos at PTA Terminal Name of Work Supply and installation of boom barriers three nos at PTA Terminal
Details: Supply and installation of boom barrier Supply, Installation, testing and commissioning of boom barrier (4 meter boom length) along with integration with Yard Automation system (MOXA Controller iologik) for movement of vehicles.(Specifications of boom barrier detailed in Annexure-1)(cost shall include all components for SITC along with cable supply and laying cost for sensors ,control cables, feedback cables etc) Civil Foundation for Boom Barrier 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived fromnatural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). TMT bars for RCC foundation Demolishing R.C.C. work manually/ by mechanical meansincluding stacking of steel bars and disposal ofunserviceable material within 50 meter lead as pe rdirection of Engineer-in-charge. Taking out existing CC interlocking paver blocks fromfootpath/ central verge, including removal of etc.,disposal of unserviceable material to the dumping ground,for which payment s
Sector: Custom1